Below is the second biggest interchange in Europe, the Gravelly Hill Interchange, or ‘Spaghetti Junction.’

It would cost approximately US$250 million to build at today’s prices, and it comprises 30 kilometres of road, with an additional 117 kilometres of connected roads, including the 30 kilometres within the interchange.

Yet Zimbabwe’s tyrant, Emmerson Mnangagwa, and his crooked surrogates are telling Zimbabweans that building 7 kilometres of road to the new parliament and refurbishing some roads in Harare during the SADC summit cost US$1.7 billion.

US$1.7 billion could build almost seven interchanges like the Gravelly Hill Interchange.
Under Mnangagwa, Zimbabwe has become a massive crime scene, with the president himself presiding over and directing criminal networks!

He will be remembered as the president who stole, looted, and plundered Zimbabwe’s public funds and natural resources.
Sadly, there is nobody to stop him!

Leave a Reply

Your email address will not be published. Required fields are marked *